Ok, pony break over, back to the bale. It was overcast and drizzly so it was actually perfect weather for this. I slowly and systematically hauled load after load until the entire bale was gone. Not bad, it only took three hours! I'm going to leave this second one for now, I have special plans for it that involve pyromania and a big brush pile!
Oops! But wait, this project is only half complete. I was able to break it down and haul it to the fence row but from here, it has to be scattered into the soil erosion area directly behind it (on the other side of the fence) that has formed due to the rain. I think I'm gonna leave that part for someone else.....